Data Migration Calculator
Plan your data migration project. Estimate time, resources, and potential downtime for a smooth transition.
Migration Types
Online Migration
Data is migrated while systems remain operational. Minimal downtime but slower migration.
Offline Migration
Systems are taken offline during migration. Faster but requires planned downtime.
Hybrid Migration
Combines online and offline approaches. Balances speed and system availability.
Quick Examples
1TB Online Migration
- Data size: 1000 GB
- Transfer speed: 100 MB/s
- Time: ~2.8 hours
- Downtime: Minimal
2TB Offline Migration
- Data size: 2000 GB
- Transfer speed: 200 MB/s
- Time: ~2.8 hours
- Downtime: Required